Description
- Flood lighting with 23 high masts for area lighting of the added berth-4 and Marpol
- Electrical distribution system and associated power supply tie-in for area lighting.
- Relocation of the existing navigation light on berth no.5 to the North end of Service Berth no.4
- Supply, Installation, Testing and Commissioning Diesel and Water dispensing skids and associated carbon steel piping modifications.
- Supply, Installation, Testing and Commissioning of Traffic signal and Controller
- Supply, Installation testing and Commissioning of Outdoor UPS and Battery Bank